A Gantt chart uses a horizontal bar graph to represent the start and finish dates of the various elements of a project. Each task or activity is listed on the vertical axis, and time intervals are listed on the horizontal axis. The length of each bar reflects the duration of the task, while the positioning of the bar indicates the start and end dates.